Heavy & oversized cargo
Big Freight Flies Here
Machines, long lengths and heavy units travel on freighter services with certified load planning, high-loaders at both ends and permits arranged in advance.
20t+
Single pieces
Piece weights beyond belly limits fly freighter.
6m+
Long lengths
Main-deck positions for out-of-gauge lengths.
ULD
Certified builds
Engineered load plans signed off before uplift.
24/7
Project desk
Route surveys, cranes and escorts arranged.
Send drawings and weights — get a certified lift plan with your quote.
Request lift plan